- 59% weighted to light oil and natural gas liquids
- Majority Company operated with high working interests
- Extensive inventory of projects across all properties
- Recent light oil drilling and recompletion successes at Leduc- Woodbend
-
Leduc (D-3) infill well currently producing at 192 bbl/d
- 15 3-D defined Leduc follow-on locations
- 17 ESP installations/re-entry identified
- Nisku recompletion/stimulation producing at ~50 bbl/d
- 68 Nisku infill drills and recompletes identified
|
- Major infill and waterflood scheme planned in Ellerslie at Leduc- Woodbend
- Extensive infrastructure at Leduc- Woodbend facilitates inexpensive tieins
- Waterflood optimization and ASP flood potential at Norris
- ASP flood potential at Redwater
- Infill drilling for light oil in Pembina
- Horizontal drilling and completion application possible in a number of horizons
|