Access to the RBC Rundle VIRTUAL DATA ROOM requires registration by execution of a project confidentiality agreement. To register please contact Jill Switzer: 403 299 8446

 

 

Download Progress PDF

 

 

Progress Energy

 

Progress Energy
Resources Corp.

 

Winter 2010/2011
Asset Sale

 

Bids Due:

Jan. 17, 2011

 

adobe

PDF IM
45 Pgs, 21.8 MB

 

adobe

Confidentiality
Agreement

Primary Contact:

Tom Caldwell

403-299-8453

 

Introduction Letter | Foreward & Disclaimer | Asset Sale Overview

Fort St. John North: Overview | Beaverdam | Currant | Minor Properties

Fort St. John South: Overview | Two Rivers | Stoddart | West Eagle | Flatrock | Teal

Ojay: Overview | Area Activity | Nikanassin Development Potential | Cadotte/Falher Development Potential

Copton: Overview | Geology & Area Activity | Cardium Development Potential | Cadotte Development Potential

Two Creek: Overview | Jurassic 'A' and 'B' Pools | Jurassic 'A' Pool - ASP Upside Potential | Gething

 

COPTON - OVERVIEW

 

 

COPTON WORKING INTEREST - HIGHLIGHTS
  • Mostly operated 1,430 boe/d of gas-weighted production from Cardium and Cadotte Formations (September 2010 net production)
  • 2P Reserves 6,737 Mboe (NPV 10% $63,229M)
  • Large land position, 51,840 gross acres at 79% average working interest
  • Potential new drill locations include 17 Cadotte (vertical) and 47 Cardium gas drill locations (18 vertical, 29 horizontal)
  • 232 km of 2-D and 257 km2 of 3-D seismic trade data
  • Significant Company owned facilities that includes four compressors (90% WI)
  • Liquids-rich gas with Cardium horizontal potential

COPTON ROYALTY INTEREST - HIGHLIGHTS

  • 74 boe/d of GORRI production from three gas wells (September 2010 net Production)
  • 2P reserves 179 Mboe (NPV 10% $5,108M)
  • Greater than 50% of land is undeveloped (12,800 gross royalty acres)
  • Wells operated by Talisman and Devon

 

map

 

 

 

Map

Click to Enlarge

 

 

 

Table

Click to Enlarge

 

 

Charts

Click to Enlarge

 

 

Charts

Click to Enlarge

 

 

LAND

 

Copton Working Interest (WI): This area is located in west central Alberta near the British Columbia border. The Company maintains 51,840 gross acres within the Copton WI area. The working interests range on the lands from 18% to 100%, with an average of 79%. Mineral rights vary but generally include PNG to the base of the Cardium.

 

Copton Royalty Interest (RI): The Company owns 12,800 gross acres of royalty interest land. More than half of the total acreage is undeveloped.

 

 

PRODUCTION

 

Copton WI: Production from Copton WI is primarily liquids rich gas (~14 bbl/MMcf). Copton produced ~1,430 boe/d from 33 wells as of September 2010. The majority of the wells are operated and the remaining are operated by Talisman, Peyto, or Devon. Approximately 1,312 boe/d is gas and 118 boe/d is oil/NGLs.

 

Copton RI: Production comes from four producing wells and is currently 441 Mcf/d with no associated liquids.

 

Chart

Click to Enlarge

Chart

Click to Enlarge

 

 

 

RESERVES

 

Copton WI: The Copton WI area has Total Proved reserves of 4,006 Mboe consisting of 343 Mbbl of oil/NGL plus 21,978 MMcf of gas booked by GLJ Petroleum Consultants. An additional 1,177 Mboe of Probable Producing reserves and 1,554 Mboe of Probable Undeveloped reserves were also assigned for Total Proved plus Probable reserves of 6,737 Mboe.

 

Copton RI: Total Proved reserves of 106 Mboe are booked to five wells, four of which are producing. Additional Probable reserves were booked under the assumption of a higher recovery percentage. Total Proved plus Probable reserves are 179 Mboe.

 

 

FACILITIES

 

In the Copton/Lynx Field, the Company owns a 90% share of a central compressor station located at 01-24-060-08W6. This station collects gas from the majority of the Copton/Lynx Field, and delivers it at high pressure along with condensate to the pipeline connected Pembina Midstream Gas Plant (Cutbank) located at 07-16-062-08W6.

 

The Cutpick Field produces gas to a Company-interest compressor station located at 13-35-059-06W6 (90% WI), and is then delivered at high pressure along with condensate to the Pembina Musreau Lake Gas Plant located at 04-25-062-06W6. The Company also holds a 5% working interest in the Cutpick Energy operated plant at 02-21-060-08W6.

 

Map

Click to Enlarge

 

 

 

MARKETING

 

Copton/Lynx: The Company holds transportation agreements with TCPL/Nova to deliver gas volumes at the Pembina Midstream Gas Plant (Cutbank). Natural gas liquids are purchased by Keyera at Pembina Midstream on a one-year term contract with an evergreen clause.

 

Cutpick: The Company holds transportation agreements with TCPL and Nova to deliver gas volumes at the Pembina Musreau Lake Gas Plant. Natural Gas Liquids are purchased by Keyera on a 1 year contract with an evergreen clause.

 

Pembina is constructing a “Deep Cut” process at the Musreau Plant which is expected to come on stream in July 1, 2011. Pembina’s NGL recovery efficiencies are expected to match those of the Devon Wapiti Plant. The improved NGL yields from the Deep Cut Process at the Musreau Plant will increase the value of the Company’s gas by an estimated $0.40/Mcfe.

 

 

SEISMIC

 

The Company has ~257 km2 of 3-D trade data and ~232 km of 2-D trade data over the lands at Copton.